Of course, it shouldn't take 8 months to redo a bathroom, but I can only work on it about 1 or 2 days per month. Since the last blog entry on this project:
1. Floor is replaced with 3/4 inch outdoor grade plywood. On top of the plywood I laminated a 4-ml polyethylene barrier. Then 1/4 inch cement backer-board, thin-set and screwed into place with backerboard screws. It is ready to tile.
2. Walls are reframed. About 1/2 of the framing was recycled. The new drywall is mold resistant paperless drywall. Bathtub surround is 1/2" backer board. Insulation in the ceiling was changed from 3" to 7". New exhaust fan is installed.
Today I sanded the walls and ceiling, and painted with primer.