View from master bedroom. The closet will be annexed to make more space in the bathroom, and the entrance will be at about the middle of the current closet door. Conveniently, this will free up solid oak flooring from the closet to used for a patch in the spare bedroom, where plywood was used for a prior patch and the whole mess covered with carpeting. A linen closet will be converted into a walk-in closet for the bedroom (later) so there will not be net loss of bedroom closet space.
The original shower doesn't look too bad, but the newer shower will be a little larger, have more glass for additional light, and will have a ceiling light.
The new toilet will be in the same location, but the sink location will be moved. In its place there will be a narrow linen closet and, at least in the current plan, a jetted tub will occupy the part of the counter space where the current sink is seen. Given the low profile of the tub and the replacement of the wall to the right of the toilet with a glass shower enclosure, the space won't be as claustrophobic.
View from the original shower. The tub will be under this window. In the current plan the new window will be wider and lower, possibly a green-house-type small bay window, and the tub will be under the window.
Today I had no ambition at all. After a few hours of "homework" from work, I didn't feel like working any longer, wasn't in the mood for a nap or reading, and didnt have the mental acuity to study. So I started demolition. Closet shelves were removed, sink, counter, and toilet are gone, shower door is gone. I didn't want to mess up the houise with drywall dust, so I stopped there. With the closet doors closed and bathroom door closed, you can't tell that anything was done.
No comments:
Post a Comment