A few rows remaining for the Subway tile, and a couple of details, then the tile work is done. The color in the top photo is the closest to reality. That 'couple of details' - such as the window, will take a lot of tile cutting, so not quite done, but there is a light at the end of the tunnel. No grout on these wall yet, obviously, since the tile work isn't finished.
The sink and shower wall is getting grouted first so that I can have the plumbers come in and hook up the faucets. The other walls can be done afterwards. I will feel muich better when the sink is installed.

Initially, I thought the tile was too uneven, both the tiles and my application, but with the grout in place I'm feeling better about it. These tiles are supposed to have a 'hand made' look, so are have uneven and wavy edges, which makes them difficult to line up. The nice part is that the final product LOOKS hand made, and the play of color variation in the tiled wall makes it more interesting compared to 'perfect' tiles.

Posted by Picasa

No comments:

Post a Comment